Manufacturer for Rain Spray Test Chamber - High Temperature Muffle Furnace – Drick

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are also focusing on enhancing the things administration and QC program in order that we could keep fantastic advantage within the fiercely-competitive enterprise for Biological Incubator, Muffle Furnace Construction, Electric Blast Drying Oven, We attend seriously to produce and behave with integrity, and by the favor of customers at home and abroad in the xxx industry.
Manufacturer for Rain Spray Test Chamber - High Temperature Muffle Furnace – Drick Detail:

1: One-piece design, compared with the traditional split type, saving space.

2: Imported high-purity ceramic fiber furnace, completely avoid furnace cracking.

3: The heating system is cut off when the door is opened, effectively avoiding the accidental scalding of the experimenter.

4: Double-layer air heat insulation system, combined with new ceramic fiber heat insulation materials, greatly reduces the temperature of the shell, and it will not be hot to the highest temperature.

5: The door lock system prevents unrelated personnel from opening the door at will and causing experimental errors.

6: Ultra-fast temperature rise, the highest temperature does not exceed 30min, and the highest rate can reach 20min.

7: Imported HRE super high temperature alloy heating element, long service life, high efficiency and energy saving.

8: Multi-segment programming function, realize 30-segment controllable intelligent program, satisfy various complicated experiments. (TP type has this function)

Smoke exhaust system-quickly exhaust the flue gas inside the furnace.

Model No.

 

 

 

 

 

Power

1.5KW

2.5KW

4KW

8KW

16KW

Voltage

220V 50HZ

380V 50HZ

Heating time

RT+10~1000<30min

RT+10~1000<30min

RT+10~1000<30min

RT+10~1000<30min

RT+10~1000<40min

Temperature control accuracy

±1℃

Furnace material

Ceramic fiber

Heating element type

Resistance wire

Resistance wire Resistance wire Resistance wire

Resistance wire

Furnace size

W×D×H(mm)

120×200×80

200×300×120

200×300×200

300×400×300

400×500×400

Nominal volume

1.9L

7.2L

12L

36L

80L

Dimensions

W×D×H(mm)

430×605×550

510×705×590

530×715×690

700×860×860

800×960×960

Model No.

 

 

 

 

 

Power

1.5KW

2.5KW

4KW

8KW

16KW

Voltage

220V 50HZ

380V 50HZ

 Heating Time

RT+10~1200<30min

RT+10~1200<30min

RT+10~1200<30min

RT+10~1200<30min

RT+10~1200<40min

Temperature control accuracy

±1℃

Furnace material

Ceramic fiber

Heating element type

Resistance wire

Resistance wire

Resistance wire

Resistance wire

Resistance wire

Furnace size

W×D×H(mm)

120×200×80

200×300×120

200×300×200

300×400×300

400×500×400

Nominal volume

1.9L

7.2L

12L

36L

80L

Dimensions

W×D×H(mm)

430×605×550

510×705×590

530×715×690

700×860×860

800×960×960

 Notice:Performance parameter test under no-load conditions, no strong magnetism, no vibration: ambient temperature 20 ℃, ambient humidity 50% RH.

Non-standard incubators can be customized according to user needs (customized product cycle is 30 to 40 working days after order confirmation).

When the input power is ≥2000W, a 16A plug is configured, and the rest of the products are configured with a 10A plug.


Product detail pictures:

Manufacturer for Rain Spray Test Chamber - High Temperature Muffle Furnace – Drick detail pictures


Related Product Guide:

With advanced technologies and facilities, strict high-quality handle, reasonable rate, superior services and close co-operation with prospects, we are devoted to furnishing the best price for our customers for Manufacturer for Rain Spray Test Chamber - High Temperature Muffle Furnace – Drick , The product will supply to all over the world, such as: Cyprus, USA, Houston, If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Kimberley from Brazil - 2017.08.28 16:02
    The customer service staff's answer is very meticulous, the most important is that the product quality is very good, and packaged carefully, shipped quickly!
    5 Stars By Candy from Johannesburg - 2018.12.11 11:26
    Write your message here and send it to us